Description
MagnaFlow Universal Catalytic Converter 2.25 CA
MagnaFlow California Grade CARB Compliant Universal Catalytic Converter 418005 helps keep the check engine light off. Get the right fit for a wide array of vehicles thanks to the adaptable Universal design (cutting and welding is required). With highly corrosion resistant, stainless steel construction, you can have confidence in the quality of this catalytic converter. This replacement part is designed to meet or exceed California Air Resource Board requirements, and has undergone additional testing to comply with CARB guidelines to allow for legal use in California and CARB restricted states, for the listed vehicles.
Additional Information
Magnaflow California Universal Catalytic Converter-2.25in.
Part Type
Catalytic Converter
Product Overview
MagnaFlow specializes in superior catalytic converter and exhaust technology and has spent the past 30+ years earning its reputation as a global market leader. American engineered and manufactured, MagnaFlow Catalytic Converters combine efficient industrial design to produce a product that exceeds, rather than meets, the highest standards of product performance and efficiency in the industry. MagnaFlow uses both Ceramic and Metallic substrates with different combinations of cell density and wall thickness to meet vehicle specific requirements.
MagnaFlow Universal Catalytic Converters form the basic building blocks for a comprehensive line of direct-fit applications.
The main benefit of the universal catalytic converter is that one unit may cover a wide variety of vehicle makes and models. Installing universal converters often requires the use of welding, cutting and tube bending equipment that is readily available to most professional installers.
All Federal catalytic converters meet EPA requirements. Federal Catalytic Converters are not legal for sale, installation or use on vehicles registered in the state of California.
All California State Catalytic converters are CARB compliant. Converters in this catalog are based on Executive Orders issued by the California Air Resource Board and must be used in accordance with this information. In California, it is illegal to select a catalytic converter for installation based solely on vehicle weight and engine size.
⢠Stainless steel construction
⢠Formulated for Gas and Diesel Applications
| Additional Application Notes | |
|---|---|
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WADXV02.8324 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WADXV02.8324 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VAD1.8VJGKEM Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Direct-Fit California OBDII Converters~Certification Level TLEV~EFN# VAD1.8VJGKEM~EFN# XADXV01.8322 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# VAD1.8VJGKEM Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WADXV01.8322 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Direct-Fit California OBDII Converters~Certification Level TLEV~EFN# XADXV01.8322~EFN# WADXV01.8322 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WADXV01.8322 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XADXV01.8322 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Direct-Fit California OBDII Converters~Certification Level TLEV~EFN# XADXV01.8322 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XADXV01.8322 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TAD2.8V8GFFM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TAD2.8V8GFFM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VAD2.8V8GKFM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VAD2.8V8GKFM Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WADXV02.8324 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XADXV02.8324 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XADXV02.8324 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XADXV01.8322 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WADXV01.8322 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WADXV01.8322 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VAD1.8VJGKEM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VAD2.8V8GKFM Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VAD2.8V8GKFM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 3ADXV04.2335 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 3ADXV04.2335 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 2ADXV04.2335 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 2ADXV04.2335 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 3ADXV04.2335 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 3ADXV04.2335 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 1ADXV01.8336 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# YADXV01.8336~EFN# 1ADXV01.8336 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 1ADXV01.8336 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 1ADXV01.8336 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TBM1.9VJGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TBM1.9VJGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# VBM1.9VJGKFK~EFN# VBM1.9VJGFEK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# VBM1.9VJGKFK~ EFN# VBM1.9VJGFEK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WBMXV01.9M44 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WBMXV01.9M44 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VBM1.9VJGKFK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VBM1.9VJGKFK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XBMXV01.9M44 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XBMXV01.9M44 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WBMXV02.8Z35 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WBMXV02.8Z35 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Rear; Sedan;; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XBMXV02.5M52 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Rear; Sedan;; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XBMXV02.5M52 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Rear; Sedan;; Certification Level : TLEV OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XBMXV02.5M52 Cutting and welding required during installation Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XBMXV02.5M52 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XBMXV02.5M52 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VBM2.8VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VBM2.8VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WBMXV02.8M52 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WBMXV02.8M52 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VBM4.4VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VBM4.4VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WBMXV04.4M62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WBMXV04.4M62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TBM4.4VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~EFN# TBM4.4VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# VBM4.4VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# VBM4.4VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WBMXV04.4M62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# WBMXV04.4M62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~EFN# SBM5.4V8GAEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# SBM5.4V8GAEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TBM5.4V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TBM5.4V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TLEV Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VBM5.4V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TLEV Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VBM5.4V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WBMXV05.4M73 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WBMXV05.4M73 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TBM4.4VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TBM4.4VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VBM5.4V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VBM5.4V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# YBMXV04.9S62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# YBMXV04.9S62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 1BMXV04.9S62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 1BMXV04.9S62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 2BMXV04.9S62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 2BMXV04.9S62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 3BMXV04.9S62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 3BMXV04.9S62 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XBMXV02.8M52 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XBMXV02.8M52 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# YBMXV03.2S52 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# YBMXV03.2S52 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VBM1.9VJGKJK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VBM2.8VJGKFK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VBM2.8VJGKFK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM3.1V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TGM3.1V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TGM3.1V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM3.1V8G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VGM3.1V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM3.1V8G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# WGMXV03.1043~ EFN# WGMXV03.1044 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# WGMXV03.1043~EFN# WGMXV03.1044 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WGMXV03.1043~EFN# WGMXV03.1044 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TGM2.2V8GKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM2.2V8GKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TGM2.2V8GKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TGM5.7V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM5.7V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~EFN# TGM2.4VJG2EK~EFN# TGM2.4VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level : TIER1 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WGMXV02.4026 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WGMXV02.4026 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WGMXV02.4026 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM3.1V8GFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TGM3.1V8GFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM3.1V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM3.1V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WGMXV03.1042 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# WGMXV03.1042 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WGMXV03.1042 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# S1G3.8V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# S1G3.8V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM3.8V8GKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TGM3.8V8GKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM3.8V8GKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VGM3.8V8GKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WGMXV03.8049 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WGMXV03.8049 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XGMXV03.8051 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XGMXV03.8051 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VGM5.7V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM5.7V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WGMXV05.7082 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# WGMXV05.7082 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WGMXV05.7082 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XGMXV05.7082 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XGMXV05.7082 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XGMXV05.7082 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM4.3V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TGM4.3V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XGMXV03.8048 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XGMXV03.8048 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TGM3.4VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TGM3.4VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM3.4VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WGMXV03.8048 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WGMXV03.8048 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM3.4VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VGM3.4VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM3.4VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WGMXV02.4026 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WGMXV02.4026 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM3.4VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM3.4VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WGMXV03.8048 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WGMXV03.8048 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM2.218GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VGM2.218G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM2.218G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM2.218G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# WGMXT02.2122~EFN# WGMXT02.2124 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WGMXT02.2122~EFN# WGMXT02.2124 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# WGMXT02.2122~ EFN# WGMXT02.2124 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XGMXT02.2122 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XGMXT02.2122 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XGMXT02.2122 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level : TLEV | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# 3GMXT02.2121 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 3GMXT02.2121 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 3GMXT02.2121 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# S3G4.319GFEJ 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM4.31PGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WSKXT1.59CMC Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WSKXT1.59CMC Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WSKXT1.59CMC Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TCR148VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TCR148VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VCR148VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VCR148VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TCR152VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TCR152VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VCR152VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VCR152VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# YCRXV0152V20 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# YCRXV0152V20 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WCRXV0152V20 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WCRXV0152V20 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XCRXV0152V20 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XCRXV0152V20 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# SDS2.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# SDS2.0VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# SDS2.0VJGFEK~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TDS2.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TDS2.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VDS2.0VJGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VDS2.0VJGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WDSXV02.0GBK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WDSXV02.0GBK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# XDSXV02.0GBK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# XDSXV02.0GBK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# XDSXV02.0GBK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WCRXV0152V20 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WCRXV0152V20 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XCRXV0152V20 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XCRXV0152V20 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# SDS2.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# SDS2.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WDSXV02.0GBK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WDSXV02.0GBK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# XDSXV02.0GBK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# XDSXV02.0GBK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TCR122VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TCR122VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VCR122VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VCR122VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WCRXV02.0VB1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WCRXV02.0VB1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# XCRXV02.0VB1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# XCRXV02.0VB1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# XCRXV02.0VB1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# YCRXV02.0VB1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# YCRXV02.0VB1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# YCRXV02.0VB1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# SMT2.4VJGFEA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# SMT2.4VJGFEA 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# SMT2.4VJGFEA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TDS2.0VJGFEK~EFN# TDS2.0VJGFEL 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TDS2.0VJGFEK~EFN# TDS2.0VJGFEL~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VDS2.0VJGKEK~EFN# VDS2.0VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VDS2.0VJGFEK~EFN# VDS2.0VJGKEK~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WDSXV02.0GBK~EFN# WDSXV02.0GBP 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# WDSXV02.0GBK~EFN# WDSXV02.0GBP~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TDS2.0VJGFEK~ EFN# TDS2.0VJGFEL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TDS2.0VJGFEK~ EFN# TDS2.0VJGFEL Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VDS2.0VJGKEK~ EFN# VDS2.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VDS2.0VJGKEK~ EFN# VDS2.0VJGFEK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WDSXV02.0GBK~ EFN# WDSXV02.0GBP Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WDSXV02.0GBK~ EFN# WDSXV02.0GBP Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# SDS2.0VJGFEK~EFN# SDS2.0VJGFFK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# SDS2.0VJGFEK~EFN# SDS2.0VJGFFK~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# SDS2.0VJGFEK~ EFN# SDS2.0VJGFFK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# SDS2.0VJGFEK~ EFN# SDS2.0VJGFFK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TFM1.9V8GKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TFM1.9V8GKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VFM2.0V8G2EK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VFM2.0V8G2EK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TFM1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TFM1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WFMXV02.0ATA~ EFN# WFMXVO2.0BTA Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WFMXV02.0BTA~EFN# WFMXV02.0ATA Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XFMXV02.0VDN Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XFMXV02.0VDN Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Front Right; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TFM2.0VJG2HK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Front Right; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TFM2.0VJG2HK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TFM2.318G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TFM2.318G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VFM2.318G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VFM2.318G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TSK1.61JGHHB Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TSK1.61JGHHB Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TSK1.61JGHHB Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VSK1.61JGKHK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VSK1.61JGKHK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VSK1.61JGKHK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TGM2.218GFEK~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TGM2.218GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TGM2.218GFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM2.218G1EK~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VGM2.218G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VGM2.218G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WGMXT02.2122~EFN# WGMXT02.2124~OE Spec Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ OE Spec~ EFN# WGMXT02.2122~ EFN# WGMXT02.2124 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# WGMXT02.2122~EFN# WGMXT02.2124 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XGMXT02.2122~OE Spec Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XGMXT02.2122 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XGMXT02.2122 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# 3GMXT02.2121~OE Spec Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# 3GMXT02.2121 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 3GMXT02.2121 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# THY1.5VJG1FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# THY1.5VJG1FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VHY1.5VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VHY1.5VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WHYXV01.52GM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WHYXV01.52GM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XHYXV01.52XC 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XHYXV01.52XC 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# SHY1.6VJG1FB 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# SHY1.6VJG1FB 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# THY1.8VJG1FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# THY1.8VJG1FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VHY1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VHY1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WHYXV01.82GM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WHYXV01.82GM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# SHY1.8VJG1GB 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# SHY1.8VJG1GB 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# SHY2.0VJG1FB 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# SHY2.0VJG1FB 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# SHY2.0VJG1FB 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# THY2.0VJG1FK~EFN# THY3.0V8G1FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# THY3.0V8G1FK~EFN# THY2.0VJG1FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# THY3.0V8G1FK~ EFN# THY2.0VJG1FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# THY3.0V8G1FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# THY3.0V8G1FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VHY3.0V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VHY3.0V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WHYXV03.01UM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# WHYXV03.01UM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WHYXV03.01UM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WHYXV02.02GM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WHYXV02.02GM 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VHY2.0VJG2FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VHY2.0VJG2FK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WSZXTO2.21HK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WSZXT02.21HK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WSZXTO2.21HK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XSZXT02.21HK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XSZXT02.21HK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XSZXT02.21HK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM2.218GFEK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM2.2V8G1EK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# WGMXT02.2122~ EFN# WGMXT02.2124 Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XGMXT02.2122 Cutting and welding required during installation Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TGM2.218GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TGM2.218GFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TGM2.218GFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM2.2V8G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM2.2V8G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# SKM1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# SKM1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TKM1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TKM1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VKM1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VKM1.8VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TKM2.01JG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TKM2.01JG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TKM2.01JG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VKM2.01JG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VKM2.01JG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VKM2.01JG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TTY3.0VJG1GK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTY3.0VJG1GK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTY3.0VJG1GK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VTY3.0VJGKFK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTY3.0VJGKFK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTY3.0VJGKFK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# STY3.0VJGFEK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# STY3.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# STY3.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TTY3.0VJG1GK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VTY3.0VJGKFK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TFM2.318G1EK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VFM2.318G1EK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTK1.8VJGKEK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTK1.8VJGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TTK1.8VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTK1.8VJGKEK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTK1.8VJGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VTK1.8VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VTK2.5VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTK2.5VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# XTKXV02.5VB4 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# XTKXV02.5VB4 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# YTKXV02.5VB4 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# YTKXV02.5VB4 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Rear Right; Certification Level : TLEV Position: Rear Left; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WMBXV05.0GNB Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Rear Right; Certification Level : TLEV Position: Rear Left; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WMBXV05.0GNB 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WMBXV05.0GNB 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Rear Right; Certification Level : TLEV Position: Rear Left; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XMBXV05.0GND 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Rear Right; Certification Level : TLEV Position: Rear Left; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XMBXV05.0GND 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right Center; Certification Level : TLEV Position: Rear Right; Certification Level : TLEV Position: Rear Left; Certification Level : TLEV Position: Left Center; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 1MBXV05.8TBI 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right Center; Certification Level : TLEV Position: Rear Right; Certification Level : TLEV Position: Rear Left; Certification Level : TLEV Position: Left Center; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 1MBXV05.8TBI 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right Center; Certification Level : TLEV Position: Rear Right; Certification Level : TLEV Position: Rear Left; Certification Level : TLEV Position: Left Center; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# 2MBXV05.8TBI 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right Center; Certification Level : TLEV Position: Rear Right; Certification Level : TLEV Position: Rear Left; Certification Level : TLEV Position: Left Center; Certification Level : TLEV Position: Front Right; Certification Level : TLEV Position: Front Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 2MBXV05.8TBI 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# VMB5.0VJGKEK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VMB5.0VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VMB5.0VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Position: Front Right; Certification Level : TIER1 Position: Front Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VMB6.0VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Position: Front Right; Certification Level : TIER1 Position: Front Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VMB6.0VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WFMXV02.0ATA Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WFMXV02.0ATA Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VML3.5VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VML3.5VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WMLXV03.5GBG Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WMLXVO3.5GBG Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~EFN# TDS2.0VJGFEK~EFN# TDS2.0VJGFEL 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# VDS2.0VJGKEK~EFN# VDS2.0VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ EFN# TDS2.0VJGFEK~ EFN# TDS2.0VJGFEL Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~EFN# SDS2.0VJGFEK~EFN# SDS2.0VJGFFK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~EFN# SDS2.0VJGFEK~EFN# SDS2.0VJGFFK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~OE Spec~EFN# XDSXV02.0GBK~EFN# XDSXV02.0GBP 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ EFN# SDS2.0VJGFEK~ EFN# SDS2.0VJGFFK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ EFN# SDS2.0VJGFEK~ EFN# SDS2.0VJGFFK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ OE Spec~ EFN# XDSXV02.0GBK~ EFN# XDSXV02.0GBP Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ OE Spec~ EFN# XDSXV02.0GBK~ EFN# XDSXV02.0GBP Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~EFN# SDS2.0VJGFEK~EFN# SDS2.0VJGFFK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# TDS2.0VJGFEK~EFN# TDS2.0VJGFEL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ EFN# TDS2.0VJGFEK~ EFN# TDS2.0VJGFEL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~EFN# VDS2.0VJGKEK~EFN# VDS2.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WDSXV02.0GBK~EFN# WDSXV02.0GBP Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~OE Spec~EFN# XDSXV02.0GBK~EFN# XDSXV02.0GBP Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TDS2.4VJGKFL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TDS2.4VJGKFL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# VDS2.4VJGKFK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# SMT2.4VJGFEA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# 2MMYV04.0ML2 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 2MMYVO4.0ML2 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 3MMYV04.0MA3~EFN# 3MMYVO4.0MA3 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 3MMYVO4.0MA3 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# SNS2.4VJGFFK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# SNS2.4VJGFFK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# SNS2.4VJGFFK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TNS2.4VJG1GK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TNS2.4VJG1GK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TNS2.4VJG1GK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VNS2.4VJGKFK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VNS2.4VJGKFK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VNS2.4VJGKFK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WNSXV02.4A3B Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WNSXV02.4A3B Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WNSXV02.4A3B 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Front Right; Certification Level : TIER1 Position: Front Left; Certification Level : TIER1 OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TNS3.0VJGFGK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TNS3.0VJGFGK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Front Right; Certification Level : TIER1 Position: Front Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TNS3.0VJGFGK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# WGMXV02.4025~EFN# WGMXV02.4026 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# WGMXV02.4025~ EFN# WGMXV02.4026 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WGMXV02.4025~EFN# WGMXV02.4026 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TGM3.1V8GFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TGM3.1V8GFEK~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TGM3.1V8GFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WGMXV03.1042 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# WGMXV03.1042 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VGM2.4VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VGM2.4VJG1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM2.4VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM3.1V8G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VGM3.1V8G1EK~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VGM3.1V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VGM3.1V8G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TCR122VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TCR122VJG1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WCRXV02.0VB1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WCRXV02.0VB1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VGM5.7V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VGM5.7V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WGMXV05.7082 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# WGMXV05.7082~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WGMXV05.7082 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XGMXV05.7082 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XGMXV05.7082~OE Spec Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XGMXV05.7082 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TGM2.4VJG2EK~EFN# TGM2.4VJGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TGM2.4VJG2EK~ EFN# TGM2.4VJGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# TGM2.4VJG2EK~EFN# TGM2.4VJGKEK~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# WGMXV02.4025~ EFN# WGMXV02.4026 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WGMXV02.4025~EFN# WGMXV02.4026 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XGMXV02.4025 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XGMXV02.4025 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XGMXV02.4025 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XGMXV03.4042 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XGMXV03.4042 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XGMXV03.4042 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# VGM3.8V8G1FK~ EFN# VGM3.8V8G2EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# VGM3.8V8G1FK~EFN# VGM3.8V8G2EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ OE Spec~ EFN# WGMXV03.8048~ EFN# WGMXV03.8051 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# WGMXV03.8048~EFN# WGMXV03.8051 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~EFN# VGM3.1V8G1EK Cutting and Welding Required During Installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# VGM3.1V8G1EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ EFN# VGM3.1V8G1EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WGMXV03.1043~EFN# WGMXV03.1044~OE Spec Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# WGMXV03.1043~EFN# WGMXV03.1044 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ OE Spec~ EFN# WGMXV03.1043~ EFN# WGMXV03.1044 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# VGM3.8V8G1FK~EFN# VGM3.8V8G2EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# VGM3.8V8G1FK~ EFN# VGM3.8V8G2EK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# WGMXV03.8048~EFN# WGMXV03.8051 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ OE Spec~ EFN# WGMXV03.8048~ EFN# WGMXV03.8051 Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XPRXV03.4996 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# XPRXV03.4996 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XPRXV03.4996 Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WPRXV03.6993 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WPRXV03.6993 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WPRXV02.5986 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WPRXV02.5986 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# XSAXV02.0TD1~EFN# XSAXV02.0TD2 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# XSAXV02.3TD1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XSAXV02.3TD1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# XSAXV02.3TD1~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# XSAXV02.3TE1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# XSAXV03.0TE1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# XSAXV03.0TE1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# XSAXV03.0TE1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# YSAXV03.0TE1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# YSAXV03.0TE1 Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TSA2.5VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TSA2.5VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VSA2.5VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VSA2.5VJGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# TSA2.3VJGKGK~EFN# TSA2.3VJGKFK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# VSA2.3VJGKFK~EFN# VSA2.3VJGKGK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TSA3.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~EFN# TSA3.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VSA3.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~EFN# VSA3.0VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# TGM1.9VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# TGM1.9V8G2EK~ EFN# TGM1.9VJGFEK~ EFN# TGM1.9VJG2JL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VGM1.9V8G2EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VGM1.9V8G2EK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WGMXV01.9002 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WGMXV01.9002 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XGMXV01.9002 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XGMXV01.9002 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# TGM1.9V8G2EK~ EFN# TGM1.9VJGFEK~ EFN# TGM1.9VJG2JL Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# TGM1.9V8G2EK~EFN# TGM1.9VJGFEK~EFN# TGM1.9VJG2JL Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# VGM1.9V8G2EK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# VGM1.9V8G2EK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WGMXV01.9002 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# WGMXV01.9002 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XGMXV01.9002 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XGMXV01.9002 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# TGM1.9VJGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# TGM1.9V8G2EK~ EFN# TGM1.9VJGFEK~ EFN# TGM1.9VJG2JL 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# TGM1.9V8G2EK~EFN# TGM1.9VJGFEK~EFN# TGM1.9VJG2JL 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WGMXV01.9002 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WGMXV01.9002 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~EFN# TGM1.9V8G2EK~EFN# TGM1.9VJGFEK~EFN# TGM1.9VJG2JL Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# VGM1.9V8G2EK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# VGM1.9V8G2EK Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# WGMXV01.9002 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~EFN# XGMXV01.9002 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TSK1.81JGHHB Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TSK1.81JGHHB Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VSK1.81JGKHK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VSK1.81JGKHK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WSKXT1.84CHC Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WSKXT1.84CHC Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level : TIER1 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TSK1.61JGHHB Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VSK1.61JGKHK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TSK1.6VJGHHB Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TSK1.6VJGHHB Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VSK1.6VJGKHK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VSK1.6VJGKHK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WSKXV1.59CMC Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WSKXV1.59CMC Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TTY2.71HGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTY2.71HGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTY2.71HGKEK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTY2.71JGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level : TIER1 ARB-O | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WTYXT02.7BBH Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXT02.7BBH Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXT02.7BBH Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXV03.0BBA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# WTYXV03.0BBA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXV03.0BBA Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WTYXV03.0BBA 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# YTYXV03.0BBA Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# YTYXV03.0BBA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# YTYXV03.0BBA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# 1TYXV0.3.0BBA Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# 1TYXV03.0BBA~EFN# 1TYXV0.3.0BBA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# 1TYXV0.3.0BBA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# 2TYXV03.0BBC 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Rear; Certification Level : TIER1 Position: Front; Certification Level : TIER1 OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXV03.0BBC Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Rear; Certification Level : TIER1 Position: Front; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXV03.0BBC 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Position: Rear; Certification Level : TIER1 Position: Front; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WTYXV03.0BBC 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# STY2.71HGEEK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# STY2.71HGEEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# STY2.71HGEEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTY2.71HGKEK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTY2.71HGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VTY2.71HGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WTYXT02.7BBH Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WTYXT02.7BBH Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WTYXT02.7BBH Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# STY3.41JG1GK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# STY3.41JG1GK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# STY3.41JG1GK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# STY3.41JG1GK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTY3.42JG1GK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTY3.42JG1GK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TTY3.42JG1GK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTY2.71HGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VTY2.71HGKEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WTYXT02.7BBH 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXT02.7BBH 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# STY2.41HG1GK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# STY2.41HG1GK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# STY2.41HG1GK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTY2.41HGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TTY2.41HGKEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTY2.41HGKEK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VTY2.41HGKEK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXT02.4BBH Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXT02.4BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WTYXT02.4BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# XTYXYO2.4BBH Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# XTYXYO2.4BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# XTYXYO2.4BBH~EFN# XTYXT02.4BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec; Cutting and Welding Required During Installation | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# VTY2.71JGKEK~EFN# VTY2.71JG2GK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# VTY2.71JGKEK~ EFN# VTY2.71JG2GK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# VTY2.71JGKEK~ EFN# VTY2.71JG2GK Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# WTYXT02.7BBH~EFN# WTYXT02.7DXH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# WTYXT02.7BBH~ EFN# WTYXT02.7DXH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# WTYXT02.7BBH~ EFN# WTYXT02.7DXH Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# XTYXT02.7DXJ~EFN# XTYXT02.7BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# XTYXT02.7DXJ~ EFN# XTYXT02.7BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# XTYXT02.7DXJ~ EFN# XTYXT02.7BBH Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# STY3.41JGFEK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# STY3.41JGFEK 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# STY3.41JGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# STY3.41JGFEK~OE Spec Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TTY3.41JGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TTY3.41JGFEK Cutting and welding required during installation Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TTY3.41JGFEK Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VTY3.41JGKEK Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VTY3.41JGKEK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VTY3.41JGKEK Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WTYXT03.4BBH Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WTYXT03.4BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WTYXT03.4BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# XTYXT03.4BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XTYXT03.4BBH Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# XTYXT03.4BBH Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# XTYXT03.4BBH Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WTYXT02.4BBH 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# WTYXT02.7BBH~EFN# WTYXT02.7DXH 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WTYXT03.4BBH 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and welding required during installation Certification Level : TIER1 | |
| • Certification Level : TLEV Certification Level : TIER1 | |
| • OE Spec Cutting and welding required during installation Certification Level : TLEV Certification Level : TIER1 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# XTYXT03.4BBH 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XTYXT03.4BBH Cutting and Welding Required During Installation Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Certification Level TIER1~Cutting And Welding Required For Installation~EFN# XTYXT03.4BBH~OE Spec 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE SPEC Certification Level : TLEV Certification Level : TIER1 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# XTYXT02.7DXJ~EFN# XTYXT02.7BBH 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XTYXT02.7BBH~EFN# XTYXT02.7DXJ Certification Level : TLEV Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WADXV01.8322 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XADXV01.8322 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XADXV01.8322 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# TVV2.9VJGFEL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# TVV2.9VJGFEL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# VVV2.9VJGFEL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# VVV2.9VJGFEL Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WVVXV2.43PA1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WVVXV2.43PA1 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WVVXV2.43PA1 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WVVXV2.43PA1 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WVVXV2.43TPF 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# WVVXV2.43TPF 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# WVVXV2.43TPF 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XVVXV2.92BU2 Cutting and Welding Required During Installation Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XVVXV2.92BU2 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XVVXV2.78EN2 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XVVXV2.78EN2 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# YVVXV2.78EN3 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# YVVXV2.78EN3 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# 1VVXV2.78T6T Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# 1VVXV2.78T6T Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TIER1~EFN# WVVXV2.92EVA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TIER1~ EFN# WVVXV2.92EVA Certification Level : TIER1 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ EFN# WVVXV2.43PA1~ EFN# WVVXV2.43TPF~ EFN# WVVXV2.43AWD Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WVVXV2.43AWD~EFN# WVVXV2.43PA1~EFN# WVVXV2.43TPF Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~EFN# WVVXV2.43PA1 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ EFN# XVVXV2.43AW2 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • OE Spec Cutting and Welding Required During Installation Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XVVXV2.43AW2 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~EFN# XVVXV2.43AW2 Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
| • Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ OE Spec~ EFN# WVVXV2.43PA1~ EFN# WVVXV2.43AWD Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119 | |
| • Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# WVVXV2.43PA1~EFN# WVVXV2.43AWD Certification Level : TLEV 2.25 in. Tubing; 2.25 in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119 | |
These additional application notes are supplied by the manufacturer and collated from multiple year ranges. Not all of these notes may apply to every year or every variant. Please contact a StreetFX agent for clarification if required.
Data: v2 - Desc: v4.2 - Upd: 2026-11-08 05:00:09
Features
- Compact, lightweight construction enables installation in confined areas, welding is required
- Compact; Lightweight Construction Enables Installation In Confined Areas; Welding Is Required
- Durable 308 stainless steel MIG welds
- Expertly formulated catalyst blend maximizes efficiency, ensuring optimal emissions control to keep your check engine light off
- Expertly Formulated Catalyst Blend Maximizes Efficiency; Ensuring Optimal Emissions Control To Keep Your Light Off
- High Strength 16 Gauge 409 Stainless Steel Tubing For Exceptional Corrosion Resistance And Maximum Service Life
- Your trusted source for CARB-compliant catalytic converters, providing assurance of genuine compliance while delivering quality that will last
- Your Trusted Source For CARB-Compliant Catalytic Converters; Providing Assurance Of Genuine Compliance
Images are supplied by the manufacturer and may be generic. While all efforts are made to provide accurate pictures, there may be differences in the actual product, such as colour, quantity, version, or included components. Please carefully review the description and specifications for details on inclusions or any variations. Some items may be sold individually or in sets, and images may occasionally depict additional products or quantities not included in your purchase. For assistance or clarification, please contact customer support.
Specifications
Product Details
| 2899: | Yes |
| Air Tube Adaptable: | No |
| Air Tube Count: | 0 |
| Body Height: | 4.375 |
| Body Length: | 11.000 in. |
| Body Material: | Stainless Steel |
| Body Shape: | Round |
| Body Type: | Clam-Shell |
| Body Width: | 4.250 in. |
| CARB Executive Order Number: | D-193-119 |
| Catalytic Converter Air Tube Adapter: | Not Air Tube Kit Adaptable |
| Catalytic Converter Body Material: | Stainless |
| Catalytic Converter Format: | Pre-Catalytic Converter and Main Catalytic Converter |
| Catalytic Converter Overall Length: | 15 |
| Clamp Included: | No |
| Clamps Included: | No |
| Converter Body Size: | OEM |
| Converter Quantity: | 1 |
| Core Substrate Material: | Ceramic |
| Finish: | Stainless Steel |
| Gasket Included: | No |
| Grade Type: | Regular |
| Hangers Included: | No |
| Heat Shield Attached: | Yes |
| Heat Shield Included: | Yes |
| Heat Shield Material: | Aluminized Steel |
| Inlet Attachment Type: | Weld-On |
| Inlet Attachment: | Weld-On |
| Inlet Diameter: | 2.25 |
| Inlet Gasket Included: | No |
| Inlet Inside Diameter: | 2.250 in. |
| Inlet Mounting Hardware Included: | No |
| Inlet Orientation: | Straight |
| Inlet Quantity: | 1 |
| Inlet Type: | Weld-On |
| Main Piping Diameter: | 2.250 in. |
| Material: | Stainless Steel |
| Mounting Hardware Included: | No |
| Outlet Attachment Type: | Weld-On |
| Outlet Attachment: | Weld-On |
| Outlet Diameter: | 2.25 |
| Outlet Gasket Included: | No |
| Outlet Inside Diameter: | 2.25 |
| Outlet Mounting Hardware Included: | No |
| Outlet Orientation: | Straight |
| Outlet Outside Diameter: | 2.250 in. |
| Outlet Quantity: | 1 |
| Outlet Type: | Weld-On |
| Overall Length: | 15.000 in. |
| Oxygen Sensor Location: | None |
| Part Number: | mag418005 |
| Pipe Material: | Stainless Steel |
| Recommended Use: | Converter |
| Sensor Port Count: | 0 |
| Substrate Material: | Ceramic |
| Subtitle: | CARB Compliant Universal Catalytic Converter |
| Tube Material: | Stainless Steel |
| Type: | Universal |
| Universal Or Specific Fit: | Universal |
Reference Information
| Reference Data (Provide these details to our support team) | |
|---|---|
| Brand Name/s | Magnaflow, MagnaFlow Exhaust Products, MAGNAFLOW PERF EXHAUST, Magnaflow Performance |
| StreetFX SKU | mag418005 |
| SFX Item ID | 4284226 |
| Accounting SKU | mag-418005 |
| Manufacturer SKU | 418005 |
| Manufacturer UPC | 888563009162 |
| Alternative References | 418005, MFL418005, MPE-418005 |
Catalytic Converter, Stainless Steel, 2.25 in. Inlet, 2.25 in. Outlet, 15.0 in. Length, Universal, Each
MagnaFlow universal catalytic converters by Car Sound form the basic building blocks for many applications. The main benefit of universal catalytic converters is that one unit may cover a wide variety of vehicle makes and models. Installing universal converters often requires the use of welding, cutting, and tube-bending equipment that is readily available to most professional installers.
They are extremely well made, with features such as:
• A ribbed body that minimizes expansion and distortion when the converter heats up. They form a channel that protects the cushioning mat from direct exposure to exhaust gasses, and hold the ceramic catalyst in proper alignment.
• A 1/2 in. lap joint where the necks meet the body. The neck does not extend into the converter body, where it could hamper exhaust flow.
• Manufactured with separate dies on different sized inlets. Putting larger neck sizes on smaller bodies would reduce the flow of the converter and the quality of the product.
• A monolithic honeycomb catalyst. The ceramic is designed for maximum flow and surface area. The coating method is strictly controlled to maintain exact specifications.
• Seam-welded close to the converter body for a strong, tight bond. Welding along the edge could allow the converter to expand like the folds in an accordion, allowing the catalyst to move around.
• Heavier-gauge stainless steel, tip-to-tip. They do not use inferior mixed weights and materials.
• An aluminized or stainless OEM-style ribbed heat shield that creates a rigid wall of protection against heat and adds to the structural stability of the converter.
| Product Attributes | |
|---|---|
| Brand | MagnaFlow |
| Manufacturer's Part Number | 418005 |
| Part Type | Catalytic Converters |
| Product Line | MagnaFlow Universal Catalytic Converters |
| UPC | 888563009162 |
| Inlet Quantity | 1 |
| Inlet Diameter (in.) | 2.25 in. |
| Converter Inlet Attachment | Slip fit |
| Outlet Quantity | 1 |
| Outlet Diameter (in.) | 2.25 in. |
| Converter Outlet Attachment | Slip fit |
| Converter Case Material | Stainless steel |
| Converter Substrate Material | Ceramic honeycomb |
| Converter Overall Length (in.) | 15.00 |
| Converter Overall Thickness (in.) | 4.25 |
| Converter Overall Width (in.) | 4.25 |
| Converter Style | 3-way |
| Remanufactured | No |
| AIR Tube | No |
| Heat Shield | Yes |
| Quantity | Sold individually. |
| Notes | Universal fit catalytic converters may require the use of welding, cutting, and tube-bending equipment for installation. Tuning may be required when changing catalytic converters. |
| CARB EO Number(s) | D-193-119 |
| Manufacturer Attributes | |
|---|---|
| Air Tube Count | 0 |
| Sensor Port Count | 0 |
| Inlet Quantity | 1 |
| Outlet Quantity | 1 |
| Body Length | 11 |
| Overall Length | 15 |
| Inlet Inside Diameter | 2.25 |
| Outlet Inside Diameter | 2.25 |
| Body Width | 4.25 |
| Body Height | 4.375 |
| Heat Shield Material | Aluminized Steel |
| Substrate Material | Ceramic |
| Body Type | Clam-Shell |
| Clamps Included | No |
| Hangers Included | No |
| Inlet Gasket Included | No |
| Inlet Mounting Hardware Included | No |
| Outlet Gasket Included | No |
| Outlet Mounting Hardware Included | No |
| Air Tube Adaptable | No |
| Body Shape | Round |
| Finish | Stainless Steel |
| Tube Material | Stainless Steel |
| Body Material | Stainless Steel |
| Inlet Orientation | Straight |
| Outlet Orientation | Straight |
| Universal Or Specific Fit | Universal |
| Inlet Type | Weld-On |
| Outlet Type | Weld-On |
| Heat Shield Attached | Yes |
| CARB Executive Order Number | D-193-119 |
| Product Class | Catalytic Converter |
| Product Outline | Your trusted source for CARB-compliant catalytic converters, providing assurance of genuine compliance while delivering quality that will last Expertly formulated catalyst blend maximizes efficiency, ensuring optimal emissions control to keep your check engine light off High strength 16 gauge 409 stainless steel tubing for exceptional corrosion resistance and maximum service life Compact, lightweight construction enables installation in confined areas, welding is required Durable 308 stainless steel MIG welds |
| Vehicle Brief | Catalytic Converter |
Compatibility
Loading compatibility information...
