Street. Track. Everything between.
07 3276 7829
Your garage Find parts for your vehicle Select year, make and model to narrow your search.

MagnaFlow Universal Catalytic Converter 2.00 1/O2 CA

SKU: MAG418034

Catalytic Converters

MAG Universal Converter...

MagnaFlow Universal Catalytic Converter 2.00 1/O2 CA

SKU: MAG418034

Catalytic Converters

MAG Universal Converter...

A$742.80
Available from MFR. This item is available from the manufacturer's distribution centre. The dispatch timeframe shown is an estimate based on historical order processing and release times for this part. This item is not held in our own warehouse, and actual dispatch timing may vary depending on manufacturer workload and logistics at the time of ordering.

Added to cart

We accept
American Express
Mastercard
Visa
PayPal Checkout
Direct Deposit
Afterpay
Apple Pay
Google Pay
Zip Pay

Description

MagnaFlow Universal Catalytic Converter 2.00 1/O2 CA

MagnaFlow California Grade CARB Compliant Universal Catalytic Converter 418034 helps keep the check engine light off. Get the right fit for a wide array of vehicles thanks to the adaptable Universal design (cutting and welding is required). With highly corrosion resistant, stainless steel construction, you can have confidence in the quality of this catalytic converter. This replacement part is designed to meet or exceed California Air Resource Board requirements, and has undergone additional testing to comply with CARB guidelines to allow for legal use in California and CARB restricted states, for the listed vehicles.

Additional Information

Magnaflow California Universal Catalytic Converter-2.00in.

Part Type

Catalytic Converter

Product Overview

MagnaFlow specializes in superior catalytic converter and exhaust technology and has spent the past 30+ years earning its reputation as a global market leader. American engineered and manufactured, MagnaFlow Catalytic Converters combine efficient industrial design to produce a product that exceeds, rather than meets, the highest standards of product performance and efficiency in the industry. MagnaFlow uses both Ceramic and Metallic substrates with different combinations of cell density and wall thickness to meet vehicle specific requirements.
MagnaFlow Universal Catalytic Converters form the basic building blocks for a comprehensive line of direct-fit applications.

The main benefit of the universal catalytic converter is that one unit may cover a wide variety of vehicle makes and models. Installing universal converters often requires the use of welding, cutting and tube bending equipment that is readily available to most professional installers.

All Federal catalytic converters meet EPA requirements. Federal Catalytic Converters are not legal for sale, installation or use on vehicles registered in the state of California.

All California State Catalytic converters are CARB compliant. Converters in this catalog are based on Executive Orders issued by the California Air Resource Board and must be used in accordance with this information. In California, it is illegal to select a catalytic converter for installation based solely on vehicle weight and engine size.
• Stainless steel construction
• Formulated for Gas and Diesel Applications

Additional Application Notes
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VHN2.2VJGKEK Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN2.2VJGKEK Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Certification Level : TLEV Certification Level : TIER1
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# VHN3.0VJG2EK Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# VHN3.0VJG2EK Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WHNXV03.0ZL2 Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# WHNXV03.0ZL2 Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XHNXV03.0ZL2 Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XHNXV03.0ZL2 Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN1.8VJGKFK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VHN1.8VJGKFK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WHNXV01.8WA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WHNXV01.8WA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XHNXV01.8WA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# XHNXV01.8WA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ OE Spec~ EFN# YHNXV01.8XA2~ EFN# YHNXV01.8WA2~ EFN# YHNXV01.8XA1 Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# YHNXV01.8XA2~EFN# YHNXV01.8WA2~EFN# YHNXV01.8XA1 Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ OE Spec~ EFN# 1HNXV01.833E~ EFN# 1HNXV01.843E~ EFN# 1HNXV01.8512 Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# 1HNXV01.833E~EFN# 1HNXV01.843E~EFN# 1HNXV01.8512 Certification Level : TLEV Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# THN1.8VJGFFK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN1.8VJGFFK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# SHN3.0VJGKEK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# SHN3.0VJGKEK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# THN3.2VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN3.2VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VHN3.2VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN3.2VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WHNXV03.2HA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WHNXV03.2HA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XHNXV03.2GL2 Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XHNXV03.2GL2 Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WCRXV0165V20 Cutting and welding required during installation Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XCRXV0165V20 Cutting and welding required during installation Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WCRXV0165V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# WCRXV0165V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XCRXV0165V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XCRXV0165V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# TCR201V8G2EK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# TCR201V8G2EK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WCRXV0195V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# WCRXV0195V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XCRXV0215V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XCRXV0215V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# 1CRXV03.5VB0 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# 1CRXV03.5VB0 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# 2CRXV03.5VB0 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# 2CRXV03.5VB0 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# VCR201V8G2EK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TLEV Position: Left; Certification Level : TLEV Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# VCR201V8G2EK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Certification Level : TIER1
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# SHN2.7VJG1EK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# SHN2.7VJG1EK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN2.7VJG1EK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# THN2.7VJG1EK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN2.7VJG1EK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VHN2.7VJG1EK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# THN1.6VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VHN1.6VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WHNXV01.6TA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN1.6VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN1.6VJGKEK Cutting and welding required during installation Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN1.6VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN1.6VJGKEK Cutting and welding required during installation Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WHNXV01.6TA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WHNXV01.6TA1 Cutting and welding required during installation Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# THN1.6VJGKEK~EFN# THN1.6VJGKHK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VHN1.6VJGKEK~EFN# VHN1.6VJGKHK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN1.6VJGKEK~ EFN# THN1.6VJGKHK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN1.6VJGKEK~ EFN# THN1.6VJGKHK Cutting and welding required during installation Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN1.6VJGKEK~ EFN# VHN1.6VJGKHK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN1.6VJGKEK~ EFN# VHN1.6VJGKHK Cutting and welding required during installation Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Certification Level : TLEV
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# YHNXT02.0UA2 Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# YHNXT02.0UA2 Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 1HNXT02.0P3E Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# 1HNXT02.0P3E Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# VHN2.01J62EK Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# VHN2.01J62EK Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# WHNXT02.0UL2 Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WHNXT02.0UL2 Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WHNXT02.0UL2 Cutting and welding required during installation Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# THN2.2VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN2.2VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VHN2.2VJGKGK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN2.2VJGKGK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WHNXV02.3BA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WHNXV02.3BA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VHN2.2VJG1EK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VHN2.2VJG1EK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WHNXV02.2SA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WHNXV02.2SA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# XHNXV02.2SA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XHNXV02.2SA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# YHNXV02.2SA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# YHNXV02.2SA1 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# 1HNXV02.2E14 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# 1HNXV02.2E14 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN2.2VJGFEK~ EFN# THN2.2VJGFFK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# THN2.2VJGFEK~EFN# THN2.2VJGFFK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# THN2.3VJGFEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN2.3VJGFEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# SNS2.0VJGFFK Cutting and Welding Required During Installation Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# SNS2.0VJGFFK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# SNS2.0VJGFFK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TNS2.0VJGFFK Cutting and Welding Required During Installation Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TNS2.0VJGFFK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TNS2.0VJGFFK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XNSXV02.0A2A 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# XNSXV02.0A2A 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# THN2.2VJGKGK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# THN2.2VJGKGK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# THN2.2VJGKGK~OE Spec Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VHN2.2VJGKGK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# VHN2.2VJGKGK~OE Spec Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VTK2.5VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VTK2.5VJGKEK Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WTKXV02.5VB2 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WTKXV02.5VB2 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XTKXV02.5VB2 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# XTKXV02.5VB2 Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# SNS1.6VJG2EK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# SNS1.6VJG2EK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# TNS1.6VJG2EK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# TNS1.6VJG2EK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# SNS2.0VJGFEK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# SNS2.0VJGFEK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# TNS2.0VJGFEK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# TNS2.0VJGFEK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VNS2.0VJGFEK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VNS2.0VJGFEK 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# WNSXV02.0A2A 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# WNSXV02.0A2A 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WCRXV0148V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# WCRXV0148V20 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XCRXV0148V30 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XCRXV0148V30 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VCR3.5VJGKEL 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VCR3.5VJGKEL 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# XCRXV03.5VB0 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# XCRXV03.5VB0 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Cutting And Welding Required For Installation~EFN# XCRXV03.5VB0~OE Spec Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# YCRXV03.5VB0 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Position: Right; Certification Level : TIER1 Position: Left; Certification Level : TIER1 Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# YCRXV03.5VB0 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 3NTXV01.8DDC Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 3NTXV01.8DDC Cutting and welding required during installation Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# 3NTXV01.8DDC Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 4NTXV01.8VRE Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 4NTXV01.8VRE Cutting and welding required during installation Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# 4NTXV01.8VRE Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 5NTXV01.8VRA Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 5NTXV01.8VRA Cutting and welding required during installation Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# 5NTXV01.8VRA Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 3TYXV01.8DDC Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 3TYXV01.8DDC Cutting and welding required during installation Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# 3TYXV01.8DDC Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• OE Spec Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# YTYXV01.5FFA Cutting and welding required during installation Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# YTYXV01.5FFA 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# YTYXV01.5FFA Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# YTYXV01.5FFA Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Certification Level TLEV~Cutting And Welding Required For Installation~EFN# WVWXV02.0226~OE Spec 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# WVWXV02.0226 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WVWXV02.0226 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XVWXV01.8228 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XVWXV01.8228 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# YVWXV01.8228 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# YVWXV01.8228 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# 1VWXV01.8229 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# 1VWXV01.8229 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VVW2.0V8GKEM 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VVW2.0V8GKEM 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# WVWXV02.0223 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# WVWXV02.0223 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~OE Spec~EFN# XVWXV02.0223 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ OE Spec~ EFN# XVWXV02.0223 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ OE Spec~ EFN# VVW2.0V8GKEM~ EFN# VVW2.0V8G2EL Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# VVW2.0V8GKEM~EFN# VVW2.0V8G2EL Certification Level : TIER1 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# XVWXV02.0223 Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TLEV~ Certification Level TIER1~ OE Spec~ EFN# XVWXV02.0223 Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TLEV~Certification Level TIER1~OE Spec~EFN# XVWXV02.0223 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• OE Spec Cutting and Welding Required During Installation Certification Level TIER1~Certification Level TLEV~Cutting And Welding Required For Installation~EFN# XVWXV02.0223~OE Spec Certification Level : TLEV 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119
• Cutting And Welding Required For Installation~Certification Level TIER1~OE Spec~EFN# VVW2.8V8GFGM 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-193-119
• Cutting And Welding Required For Installation~ Certification Level TIER1~ OE Spec~ EFN# VVW2.8V8GFGM 2in. Tubing; 2in. Inlet/Outlet; L-11 in.; W-4.25 in.; L-15 in. Overall; Round; Center/Center; Not Air Tube Kit Adaptable;CARB E.O. D-93-119

These additional application notes are supplied by the manufacturer and collated from multiple year ranges. Not all of these notes may apply to every year or every variant. Please contact a StreetFX agent for clarification if required.


Data: v2 - Desc: v4.2 - Upd: 2026-11-08 05:00:07

Data: v4.2 - Upd: 2026-11-08 04:23:20

Features

  • Compact, lightweight construction enables installation in confined areas, welding is required
  • Compact; Lightweight Construction Enables Installation In Confined Areas; Welding Is Required
  • Durable 308 stainless steel MIG welds
  • Expertly formulated catalyst blend maximizes efficiency, ensuring optimal emissions control to keep your check engine light off
  • Expertly Formulated Catalyst Blend Maximizes Efficiency; Ensuring Optimal Emissions Control To Keep Your Light Off
  • High Strength 16 Gauge 409 Stainless Steel Tubing For Exceptional Corrosion Resistance And Maximum Service Life
  • Your trusted source for CARB-compliant catalytic converters, providing assurance of genuine compliance while delivering quality that will last
  • Your Trusted Source For CARB-Compliant Catalytic Converters; Providing Assurance Of Genuine Compliance

Images are supplied by the manufacturer and may be generic. While all efforts are made to provide accurate pictures, there may be differences in the actual product, such as colour, quantity, version, or included components. Please carefully review the description and specifications for details on inclusions or any variations. Some items may be sold individually or in sets, and images may occasionally depict additional products or quantities not included in your purchase. For assistance or clarification, please contact customer support.

Specifications

Product Details

2899:Yes
Air Tube Adaptable:No
Air Tube Count:0
Body Height:4.375
Body Length:11.000 in.
Body Material:Stainless Steel
Body Shape:Round
Body Type:Clam-Shell
Body Width:4.250 in.
CARB Executive Order Number:D-193-119
Catalytic Converter Air Tube Adapter:Not Air Tube Kit Adaptable
Catalytic Converter Body Material:Stainless
Catalytic Converter Format:Pre-Catalytic Converter and Main Catalytic Converter
Catalytic Converter Overall Length:15
Catalytic Converter Oxygen Sensor Location:Post Converter
Clamp Included:No
Clamps Included:No
Converter Body Size:OEM
Converter Quantity:1
Core Substrate Material:Ceramic
Finish:Stainless Steel
Gasket Included:No
Grade Type:Regular
Hangers Included:No
Heat Shield Attached:Yes
Heat Shield Included:Yes
Heat Shield Material:Aluminized Steel
Inlet Attachment Type:Weld-On
Inlet Attachment:Weld-On
Inlet Diameter:2
Inlet Gasket Included:No
Inlet Inside Diameter:2.000 in.
Inlet Mounting Hardware Included:No
Inlet Orientation:Straight
Inlet Quantity:1
Inlet Type:Weld-On
Main Piping Diameter:2.000 in.
Material:Stainless Steel
Mounting Hardware Included:No
Outlet Attachment Type:Weld-On
Outlet Attachment:Weld-On
Outlet Diameter:2
Outlet Gasket Included:No
Outlet Inside Diameter:2
Outlet Mounting Hardware Included:No
Outlet Orientation:Straight
Outlet Outside Diameter:2.000 in.
Outlet Quantity:1
Outlet Type:Weld-On
Overall Length:15
Oxygen Sensor Location:Post Converter
Part Number:mag418034
Pipe Material:Stainless Steel
Recommended Use:Converter
Sensor Port Count:1
Substrate Material:Ceramic
Subtitle:CARB Compliant Universal Catalytic Converter
Tube Material:Stainless Steel
Type:Universal
Universal Or Specific Fit:Universal

Reference Information

Reference Data (Provide these details to our support team)
Brand Name/s Magnaflow, MagnaFlow Exhaust Products, MAGNAFLOW PERF EXHAUST, Magnaflow Performance
StreetFX SKU mag418034
SFX Item ID 4284221
Accounting SKU mag-418034
Manufacturer SKU 418034
Manufacturer UPC 888563009124
Alternative References 418034, MFL418034, MPE-418034

Catalytic Converter, Stainless Steel, 2.00 in. Inlet, 2.00 in. Outlet, 15.0 in. Length, Universal, Each

MagnaFlow universal catalytic converters by Car Sound form the basic building blocks for many applications. The main benefit of universal catalytic converters is that one unit may cover a wide variety of vehicle makes and models. Installing universal converters often requires the use of welding, cutting, and tube-bending equipment that is readily available to most professional installers.

They are extremely well made, with features such as:
• A ribbed body that minimizes expansion and distortion when the converter heats up. They form a channel that protects the cushioning mat from direct exposure to exhaust gasses, and hold the ceramic catalyst in proper alignment.
• A 1/2 in. lap joint where the necks meet the body. The neck does not extend into the converter body, where it could hamper exhaust flow.
• Manufactured with separate dies on different sized inlets. Putting larger neck sizes on smaller bodies would reduce the flow of the converter and the quality of the product.
• A monolithic honeycomb catalyst. The ceramic is designed for maximum flow and surface area. The coating method is strictly controlled to maintain exact specifications.
• Seam-welded close to the converter body for a strong, tight bond. Welding along the edge could allow the converter to expand like the folds in an accordion, allowing the catalyst to move around.
• Heavier-gauge stainless steel, tip-to-tip. They do not use inferior mixed weights and materials.
• An aluminized or stainless OEM-style ribbed heat shield that creates a rigid wall of protection against heat and adds to the structural stability of the converter.

Product Attributes
BrandMagnaFlow
Manufacturer's Part Number418034
Part TypeCatalytic Converters
Product LineMagnaFlow Universal Catalytic Converters
UPC888563009124
Inlet Quantity1
Inlet Diameter (in.)2.00 in.
Converter Inlet AttachmentSlip fit
Outlet Quantity1
Outlet Diameter (in.)2.00 in.
Converter Outlet AttachmentSlip fit
Converter Case MaterialStainless steel
Converter Substrate MaterialCeramic honeycomb
Converter Overall Length (in.)15.00
Converter Overall Thickness (in.)4.25
Converter Overall Width (in.)4.25
Converter Style3-way
RemanufacturedNo
AIR TubeNo
Heat ShieldYes
QuantitySold individually.
NotesUniversal fit catalytic converters may require the use of welding, cutting, and tube-bending equipment for installation. Tuning may be required when changing catalytic converters.
CARB EO Number(s)D-193-119

Manufacturer Attributes
Air Tube Count 0
Inlet Quantity 1
Outlet Quantity 1
Sensor Port Count 1
Body Length 11
Overall Length 15
Inlet Inside Diameter 2
Outlet Inside Diameter 2
Body Width 4.25
Body Height 4.375
Heat Shield Material Aluminized Steel
Substrate Material Ceramic
Body Type Clam-Shell
Clamps Included No
Hangers Included No
Inlet Gasket Included No
Inlet Mounting Hardware Included No
Outlet Gasket Included No
Outlet Mounting Hardware Included No
Air Tube Adaptable No
Oxygen Sensor Location Post Converter
Body Shape Round
Finish Stainless Steel
Tube Material Stainless Steel
Body Material Stainless Steel
Inlet Orientation Straight
Outlet Orientation Straight
Universal Or Specific Fit Universal
Inlet Type Weld-On
Outlet Type Weld-On
Heat Shield Attached Yes
CARB Executive Order Number D-193-119
Product Class Catalytic Converter
Product Outline Your trusted source for CARB-compliant catalytic converters, providing assurance of genuine compliance while delivering quality that will last
Expertly formulated catalyst blend maximizes efficiency, ensuring optimal emissions control to keep your check engine light off
High strength 16 gauge 409 stainless steel tubing for exceptional corrosion resistance and maximum service life
Compact, lightweight construction enables installation in confined areas, welding is required
Durable 308 stainless steel MIG welds
Vehicle Brief Catalytic Converter

Compatibility

Loading compatibility information...

Keep shopping

More from Magnaflow